QubitPage Technical Dossier

SENTINEL Factory

Purpose-built manufacturing facility in Comuna Ciurila, Cluj County, Romania — 2,400 m2 across 8 zones including production hall, cleanroom, testing lab, warehouse, GPU datacenter, and solar roof.

INTERACTIVE 3D FACILITY TOUR FULLSCREEN →
LocationCiurila, Cluj
Total Area2,400 m²
Production Hall1,200 m²
Solar Capacity200 kWp

Facility Overview

The SENTINEL factory is located in Comuna Ciurila, Cluj County, Romania — 15 km south-west of Cluj-Napoca. The 2,400 m² facility is divided into 8 purpose-designed zones, each optimised for a specific stage of the production pipeline.

Zone 1 — Exterior & Solar Roof

The building features a flat industrial roof with 200 kWp of monocrystalline solar panels, providing ~240 MWh/year. Grid connection serves as backup and overnight load, targeting net-zero production by Year 2. External areas include loading docks, emergency access, visitor parking, and secured perimeter fencing with CCTV.

Zone 2 — Production Hall (1,200 m²)

The main production floor houses the assembly lines for all five SENTINEL models — WH, AG, MK, HM, and D. Key equipment installed:

  • CNC 5-axis machining centre — 6061-T6 aluminium frame fabrication
  • Laser cutter — sheet metal and composite panels
  • 6-axis robot welding cell — frame joining and SENTINEL-LINK housing fabrication
  • Battery pack assembly station with spot-welding rig
  • Final assembly stations with overhead gantry and guided fixture tooling

Zone 3 — Cleanroom (ISO 7)

An ISO 7-rated cleanroom houses the SMT pick-and-place line for PCB assembly, the SENTINEL-LINK connector gold-plating station, and precision sensor calibration. Laminar airflow, positive pressure, and gowning protocols ensure zero-defect electronics production.

Zone 4 — Testing Laboratory

Every SENTINEL unit passes through the testing lab before shipping. Capabilities include:

  • Environmental test chamber — IP67/IP68 ingress, thermal cycling (−40°C to +85°C)
  • EMC/EMI chamber — MIL-STD-461G compliance for SENTINEL-MK
  • Coordinate Measuring Machine (CMM) — dimensional quality control
  • 45-point functional burn-in test — actuators, sensors, compute, comms
  • Live obstacle course for autonomous navigation validation

Zone 5 — Warehouse & Logistics

Raw materials inbound, finished goods outbound. Racked storage for BOM components, SENTINEL-LINK modules, and ready-to-ship units. FIFO inventory management integrated with the factory ERP.

Zone 6 — GPU Datacenter

On-site compute cluster for AI model training, inference benchmarking, and fleet OTA update staging. Core hardware:

ComponentSpecification
ComputeNVIDIA DGX A100 — 8x A100 80 GB per node
InterconnectNVLink 600 GB/s + InfiniBand HDR 200 Gb/s
StorageNetApp AFF A800 — NVMe all-flash, 100 TB usable
NetworkDual 100 GbE uplink
CoolingDirect liquid cooling + hot/cold aisle containment

This infrastructure is also offered to investors as GPU compute credits via QubitPage Foundation.

Zone 7 — Office Block

Two-storey office wing for engineering, R&D, admin, finance, and HR. Includes a conference/demo room for investor visits and customer presentations. Direct access to the production floor via observation gallery.

Zone 8 — R&D Prototyping Lab

Dedicated space for next-generation SENTINEL module development. Equipped with 3D metal printer (SLM), rapid-prototyping FDM printers, electronics workbenches, and a small autonomous navigation test arena.